• Preparation, coordination, issue and administration of large value Claims and Time Extensions with ability to analyze and report various attributes such as, progress, contract variation and claims status.
• The role is a key support to Project Management and the Contracts Department, providing experienced insight into contractor performance, cost and schedule exposures.
Requirements for recovery of additional costs include:
• Analysis of contractual terms and conditions
• Analysis of tender pricing, rates and productivity levels
• Inspection and analysis of records and contractual notices
• Analysis of actual time spent, costs incurred and actual productivity achieved
• Preparation of a cause and effect detailed analysis
• Presentation and negotiation of the claim
• Identification of contractual routes for the recovery of cost
Requirements for extension of time claims include:
• Identification of planned programme and critical path
• Ascertaining the adequacy of the planned programme and correcting as necessary
• Analysis of the revised/updated programs and reasons for changes
• Inspection of records and delay notices
• Preparation of delay analysis using accepted techniques
• Presentation and negotiation of the claim
• Adopting the correct strategy is the mainstay of successful claim/dispute resolution. Needs to offer strategic guidance that is focused on the provable issues and to prepare documentation that is technically, legally and commercially correct. To be able to deal with construction disputes involving complex issues and to meet this challenge with documentation that includes high-impact demonstrative evidence and graphics.
تفاصيل الوظيفة
2013-11-13 | تاريخ الإعلان عنها: |
الدوحة, قطر | منطقة الوظيفة: |
غيرذلك | الدور الوظيفي: |
بناء وتشييد | قطاع الشركة: |
المرشح المفضل
متوسط الخبرة | المستوى المهني: |
ذكر | الجنس: |
بكالوريوس/ دبلوم عالي | الشهادة: |
تقدم الآن - وظائف في قطر - وظائف غيرذلك في قطر - بحث عن جميع الوظائف